Monday, 23 November 2015

A STUDY ON THE ASSESSMENT ON THE APPROXIMATE ESTIMATE PERRFORMANCE IN FORCASTING THE ACTUAL COST OF CONSTRUCTION PROJECTS IN NIGERIA





ABSTRACT
The purpose of this project work is based on the assessment on the approximate estimate performance in forecasting the actual cost of construction project in Kaduna state Nigeria. The problem is that improving the cost performance of construction project remains one of the challenges facing the construction industry; therefore the essence of this work is to enhance the accuracy and efficiency in actualizing the actual cost of construction project. The project highlighted the background of the study and  also discussed the  problem statement, aims  and objectives, significance of the study, scope and limitations of the study and among others, also in the literature review of the study, nature of the construction industry were discussed and concept of estimating with approaches of estimating were also discussed. The study therefore found that approach to approximate estimating has brought about a road map in estimation of construction project. it is therefore advise that consultancy and construction firms should endeavour to use this method which in actualizing the actual cost of  construction project in other to give client value for his  money. Finally, the conclusive recommendation in assessment on approximate estimate performance in forecasting the actual cost of construction project should be done to attain the aims and objectives of this study.
TABLE OF CONTENTS



Chapter one
1.1            Background of the study-                 -        -        -        -        -        -
1.2            Problem statement-        -        -        -        -        -        -        -
1.3            Aims and objectives-     -        -        -        -        -        -        -
1.4            Significance of the study-        -        -        -        -        -        -
1.5            Scope and limitation of the study-    -        -        -        -        -
1.6            Research methodology-           -        -        -        -        -        -
Chapter two
LITERATURE REVIEW
2.1     Introduction-        -        -        -        -        -        -        -        -
2.2     Nature of the construction industry- -        -        -        -        -
2.3     Construction projects-   -        -        -        -        -        -        -
2.4     The concept of estimating-      -        -        -        -        -        -
2.5     Construction cost estimate-     -        -        -        -        -        -
2.6     Estimating in construction and consultancy firms-        -        -        -
2.7     Types of construction cost estimates-                  -        -        -        -
2.7.1  Preliminary estimates-   -        -        -        -        -        -        -
2.7.2  Detailed estimates-                  -        -        -        -        -        -        -
2.8     Methods of preparing cost estimates-         -        -        -        -        -
2.8.1  Unit Rate method of estimating-                 -        -        -        -        -
2.8.2  Storey enclosure method-                 -        -        -        -        -        -
2.8.3  Cubic Method-     -        -        -        -        -        -        -        -
2.8.4  Approximate quantities method-      -        -        -        -        -
2.8.5  Elemental cost analysis method-                -        -        -        -        -
2.8.6  Cost modelling method-          -        -        -        -        -        -       
2.8.7  Superficial area method-                   -        -        -        -        -        -
2.8.8  Parametric cost analysis-                  -        -        -        -        -        -
2.8.9  Cost planning methods-          -        -        -        -        -        -
2.8.10         Unit quantity method of detail estimating- -        -        -
2.8.11         Measured quantity method of detailed estimating-        -        -
2.9     estimated and actual cost-       -        -        -        -        -        -
2.10   Purpose of cost estimate-                  -        -        -        -        -        -
2.11   Accuracy of construction cost estimate-     -        -        -        -
2.12   Factors influencing the level of accuracy of construction cost estimates-   -        -        -          -                  -        -        -        -        -
2.13   Improving the accuracy of cost estimates-  -        -        -        -
2.14   Requirement for an accurate estimate-                 -        -        -       
2.14.1 Cost information-         -        -        -        -        -        -        -
2.14.2         Application of rates       -        -        -        -        -        -        -
2.14.3         Periodic estimating accuracy review-          -        -        -        -
2.14.4         Measuring accuracy of performance-                   -        -        -
2.15   Studies on cost estimates performance-      -        -        -        -
Chapter three
RESEARCH METHODOLOGY
3.1     Introduction
3.2     Study area
3.3     Characteristic of the study population
3.4     Sampling frame and sampling technique
3.5     Sampling design and procedure
3.6     Administration of the data collection instrument
3.7     Statistical tools for data analysis
3.7.1  Percentile method
3.7.2  Factor analysis method
 3.7.3  Relative importance index
Chapter four
DATA PRESENATATION, ANALYSIS AND DISCUSSION
4.1      Introduction
4.2      Data presentation
4.3      Data and questionnaire analysis
4.4      Identification and assessment of cost estimating methods used for construction projects
4.5      Determining the level of accuracy of construction cost estimates using secondary data
4.6      Factors influencing the level of accuracy of construction cost estimates.
4.7      Discussion of results
  4.8     Summary of findings
Chapter five
CONCLUSION AND RECOMMENDATION
5.1      Conclusion
5.2      Recommendations for implementation
Reference
Appendix (photograph, BOQ, Maps and achitectuaral drawings)
 




REQUEST FOR PROJECT MATERIAL

Good Day Sir/Ma,

WARNINGS!

PLEASE make sure your project topic or related topic is found on this website and that you have preview the abstract or chapter one before making payment.

Thanks for your interest in the research topic. The complete research work will cost you N2000 and we will send the material to you within 24hours after confirming your payment.

Make the payment of N2000 into any of the account number below and we will send the complete material to you within 24hours after confirming your payment.
Account Name: Agada Leonard E
Account No: 2070537235
Bank: UBA
Or
Account Name: Agada Leonard E
Account No: 3049262877
Bank: First Bank
Or
Account Name: Agada Leonard
Account No: 0081241151
Bank: Diamond Bank

After payment, send the following information to us through this email
address: enemsly@gmail.com

Topic paid for:
Amount Paid:
Date of Payment:
Teller No or Transaction ID:
Name of Depositor:
Depositor Phone Number:
Email address:

NOTE: The material will be forwarded to the email address you provided
within 24hrs after confirmation of the payment.
Thanks.
Agada Leonard E.
For: Enems Project.

 For more information visit our contact page @ CONTACT US

No comments:

Post a Comment

 SOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Within 24hrs. For more details Chatt with us on WHATSAPP @ https://wa.me/2348055730284