Friday 13 November 2015

A STUDY ON THE PREPARATION OF BILLS OF QUANTITIES FOR THE CONSTRUCTION OF THREE BEDROOM BUNGALOW


ABSTRACT
This project works involves the preparation of detailed working drawings and bills of Quantity in line with the requirement. It was conducted to determine the cost implication of three bedroom bungalow using the elemental method of preparing bill of quantity. Market survey was conducted through which unit rate were established to price the bill of quantity. The cost implication of the three bedroom bungalow was found to be N8,917,717.92. The percentage of superstructure concrete work to the total estimated cost is 9.81%, percentage of superstructure block work to the total  estimated cost is 7.84%, the ratio of superstructure concrete / block work to the total estimated cost is 1:5 and the cost per gross floor area of the design is N151.40.

No comments:

Post a Comment

 SOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Within 24hrs. For more details Chatt with us on WHATSAPP @ https://wa.me/2348055730284