Saturday 11 November 2017

AN ASSESSMENT OF MAINTENANCE MANAGEMENT PRACTICE IN PUBLIC HOSPITAL BUILDING

AN ASSESSMENT OF MAINTENANCE MANAGEMENT PRACTICE IN PUBLIC HOSPITAL BUILDING

 (CASE STUDY FEDERAL MEDICAL CENTRE KEFFI).

ABSTRACT
The research aims at assessing the maintenance management practice in public hospital building. The research objectives are to investigate the current state of public hospital building in federal Medical centre Keffi (FMC) and also to determine the Factors responsible for the mismanagement of the public hospital building. Simple percentage rating was used to analysis the data collected. The research  reveals that the study area adopts direct labour method of contracting a frequency of 77%.  Similarly the absence of  maintenance  strategy, poor workmanship are the most factors responsible for the  current defect in the study area with 25% each. Major causes of defects in public hospitals were identify as negligence and poor workmanship with rating of 56% and 29% respectively. Research concludes that lack of maintenance culture, poor workmanship, negligence, absence of maintenance strategies are the most factors that affects the maintenance culture in the study area.

CHAPTER ONE
1.0 INTRODUCTION
Maintenance management of hospital buildings is one of the complex subjects in the field of facilities management (shohet, 2005) contributing to this is the complex nature of hospitals buildings the delicate mechanical and electrical systems and inadequate maintenance budgets. The qualities of physical environment in which patients receive care affect patient recovery rate, staff satisfaction, and organisation productivity. Such effect can be positive or negative (Malkin and Wiley 1992).

Public hospitals are usually large buildings that have significant impact on the environment, and the economy of the surrounding community the physical surroundings in hospital constitute health problems in public health delivery (Dilani, 1999). Patients in a healthcare facility are often fearful and uncertain about their health, their safety and their isolation from normal social relationships.

The performance of hospital buildings and their components depends to a large extent on continuous and planned periodical maintenance (Shohet 2003). Maintenance is the art of controlling the rate at which structure deteriorate towards a state of unservicability and collapse (smith, 2003).

Government owned hospitals are confronted with unique challenges that threaten their existence, through an examination of the history, characteristics, and structure of public hospitals it is found that such institutions by their nature lack the capacity to complete in a market- driven economy (stobzenberg, 2002). This deficiency is further found to originate from the institutions inherent government structure, which promotes inefficiencies and inflexibility through the imposition of bureaucratic impediments to operational effectiveness.  according to Onifade(2003), Installed health facilities are as old as the hospitals themselves. Some of the medical equipments are unserviceable and need outright replacement.

The need for maintenance arises because buildings inevitably deteriorate with time due to effect of various causes. In Nigeria maintenance is given very little priority. A more progressive attitude should be to conserve the existing building stock through proper maintenance because it is a major national asset (Hutton and Lloyd, 1993). Therefore the principal proposition of this research is on an assessment of maintenance management practices in public hospital building in Nigeria and in the process identify the essential skills for maintenance managers for executing an assessment of maintenance programme in a hospital built environment. The colonial architecture in some of the old hospitals, which were tither to famous for their sturdiness and functionality, has now become less attractive because of the neglect of building maintenance. Over crowding has also led to deterioration of these facilities, patients in a healthcare facility are often fearful, uncertain about their health and society.

1.2   Statement of the problem
 Government owned hospital are confronted with unique challenges that threaten their existence in Nigeria installed health facilities are as old as the hospitals themselves some of the medical equipment are unserviceable and need out right replacement.

The state of maintenance and the physical surroundings in public hospitals buildings are present health problems in public health acre delivery, patients in a healthcare facility are uncertain about their safety. This deficiency is further found to originate from the institutions inherent government structure, which promotes inefficiencies and inflexibility through the imposition of bureaucratic impediments to operational effectiveness. The quality of the maintenance manager is another factor found to be affecting the execution of maintenance operations in public buildings. This has a direct impact on staff performance, productivity, satisfaction and turnover, management is a living force and it is the force that gets things done to acceptable standards.

1.3   The need for the study.
Many Nigeria public hospitals are often inadequately maintained, windows, doors, and others building elements are facilities frequently show evidence of maintenance and repair. Some public hospitals have not seen any signs of maintenance since they are constructed; this has resulted to such buildings to be dilapidated and abandoned. in view of these, it has been considered necessary to study the maintenance of public hospital buildings in Nigeria. The study is important in the since that it would not only contribute to knowledge and theory will also contribute to good maintenance practice in the public buildings in Nigeria as a whole.

1.4   Aim.
The aim of the research is to assess the maintenance management practice of public hospital building in Nigeria, to achieve this aim the following objective were pursued.

1.4.1 Objectives
–       To investigate the current state of maintenance of public hospital in the study area.
–       To determine the factors responsible for the mismanagement of the public hospital building in the study area.
–       To determine an alternate measure of maintenance practice on the public hospital building.

 1.5   Research methodology.
For the purpose of these study which reviews  relevant literature was done on the basis of which information were gathered and is been used to structure a research questionnaire for the survey other sources of information related to the topic were obtained through verbal interview.

1.6     Scope and de-limitation.
  • The study focus on the maintenance management public hospital buildings, the current condition of maintenance management and the strategies to be adopted in improving maintenance management in the study area.
  • De-limitation of the study is an assessment of maintenance management of health care and the facility used in the hospital.


    REQUEST FOR PROJECT MATERIAL

    Good Day Sir/Ma,

    WARNINGS!

    PLEASE make sure your project topic or related topic is found on this website and that you have preview the abstract or chapter one before making payment.

    Thanks for your interest in the research topic. The complete research work will cost you N2000 and we will send the material to you within 24hours after confirming your payment.

    Make the payment of N2000 into any of the account number below and we will send the complete material to you within 24hours after confirming your payment.

    Account Name: Agada Leonard E
    Account No: 2070537235
    Bank: UBA

    Or

    Account Name: Agada Leonard E
    Account No: 3049262877
    Bank: First Bank

    Or

    Account Name: Agada Leonard
    Account No: 0081241151
    Bank: Diamond Bank

    After payment, send the following information to us through this email
    address: enemsly@gmail.com

    Topic paid for:
    Amount Paid:
    Date of Payment:
    Teller No or Transaction ID:
    Name of Depositor:
    Depositor Phone Number:
    Email address:

    NOTE: The material will be forwarded to the email address you provided
    within 24hrs after confirmation of the payment.

    Thanks.

    Agada Leonard E.
    For: Enems Project.

     For more information visit our contact page @ CONTACT US

    No comments:

    Post a Comment

     SOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Within 24hrs. For more details Chatt with us on WHATSAPP @ https://wa.me/2348055730284