Quantitative Risk Analysis
Quantitative Risk Analysis This analysis uses numerical values of probability of risk events (or variables and risk factors) and their consequences. This is based on based on a simultaneous evaluation of the impact of all identified and quantified risks. The first approach of risk analysis process is to determine in which progress level of project the evaluation has to be conducted. In this case, WBS diagrams are very important. Work Breakdown Structures is the hierarchical decomposition structure of a project tasks and can be set at different level of detail (project/ phases/ tasks/ subtasks), each one attached to corresponding actor(s) and resources. Aleshin, (2001) believes that there is an interconnection between WBS of a project and its Risk Breakdown Structure (RBS) is a useful technique to associate risks. According to (Hillson et al., 2006), RBS can be used as a tool to structure the risk management process. The quantitative methods rely on probability distribution of risks and...